The Client
Grange Solar, an EPC solar company, was engaged by ESB Smart Energy Services to deliver a 7.5-hectare, 6 MW solar farm for MSD Ballydine, a leading pharmaceutical site in Tipperary, Ireland.
The Challenge
Before engaging Glan Renewables, the client faced significant challenges sourcing project management expertise to develop a large-scale solar farm on active pharmaceutical manufacturing grounds. The project required precise planning to integrate the solar system with existing operations without disrupting production, while complying with the strict environmental and safety standards of the pharmaceutical industry.
The Solution
Glan provided specialised project management services, overseeing all phases from initial risk assessments and compliance checks to construction and final integration. Leveraging our extensive experience in managing complex energy projects, we ensured the solar farm was delivered on time, within budget, and with no impact on MSD Ballydine’s operations.
The Results
The 7.5-hectare, 6 MW solar farm was successfully completed, significantly contributing to MSD Ballydine’s energy needs. It has reduced their energy costs by 21% and lowered their carbon footprint by approximately 2,500 tonnes annually.
7.5
7.3
5500
2500
21
Ready to Go Solar?
Get in touch with Glan Renewables for a free consultation and learn how
we can help bring your renewable energy vision to life.
Together, we can build a sustainable future, one solar project at a time.